平特五不中

News

December 9 -13 | Bridge entrance to Frank Dawson Adams Building closed

Published: 9 December 2024

La version fran莽aise suit.

The bridge entrance from lower campus to the Frank Dawson Adams Building will be closed from December 9 - 13 due to the installation of a large art piece in that area. A crane will be positioned on site and security barriers will be in place. To access the聽Schulich Library of Physical Sciences, Life Sciences, and Engineering, please enter the Frank Dawson Adams Building via University Street (3450 University Street, Montreal, Quebec H3A 0E8).


L'entr茅e du pont reliant le campus inf茅rieur au b芒timent Frank Dawson Adams sera ferm茅e du 9 au 13 d茅cembre en raison de l'installation d'une grande 艙uvre d'art dans cette zone. Une grue sera install茅e sur place et des barri猫res de s茅curit茅 seront mises en place. Pour acc茅der 脿 la Biblioth猫que Schulich des sciences physiques, des sciences de la vie et du g茅nie, veuillez entrer dans le b芒timent Frank Dawson Adams par la rue University (3450, rue University, Montr茅al, Qu茅bec H3A 0E8).

Back to top