MAP /procurement/taxonomy/term/708/all en On-Demand Services for Low-Voltage Electrical Work /procurement/article/demand-services-low-voltage-electrical-work <h2>Efficient Electrical Systems:聽Essential to Building Operations</h2> <p>Building Operations is dedicated to maintaining the facilities and buildings on the downtown campus, with a significant focus on electricity.</p> <h3>Comprehensive Electrical Services</h3> <p>Building Operations ensures the reliability of electrical systems through:</p> Thu, 04 Jul 2024 18:46:48 +0000 Donya Najjar Lessani 2301 at /procurement Supply of Chemicals for Water Treatment /procurement/article/supply-chemicals-water-treatment <h3>Water Management at 平特五不中</h3> <p><strong>Commitment to Reducing Water Consumption</strong></p> <p>In alignment with the Ministry of Education鈥檚 mandate to reduce on-campus water consumption, 平特五不中 is dedicated to minimizing its environmental impact. This commitment includes efforts to decrease water usage across both the downtown and Macdonald campuses.</p> <p><strong>Comprehensive Water Consumption Audits</strong></p> Wed, 03 Jul 2024 16:03:08 +0000 Donya Najjar Lessani 2296 at /procurement Supply of Natural Gas /procurement/article/supply-natural-gas <p>平特五不中 is actively addressing its greenhouse gas (GHG) emissions challenge, primarily driven by building energy consumption, notably natural gas for heating across its campuses. Alongside this, significant emissions also arise from air travel, daily commuting, and the University鈥檚 vehicle fleet.</p> <p>The downtown campus, due to its extensive building infrastructure and high concentration of energy-intensive research labs, accounts for 90% of 平特五不中鈥檚 total energy emissions.</p> Wed, 26 Jun 2024 15:24:41 +0000 Donya Najjar Lessani 2294 at /procurement Stewart Biology N Wing, Rehabilitation & Preliminary study /procurement/article/stewart-biology-north-wing-rehabilitation-preliminary-study Type: Construction / Status: Validation Wed, 10 Jan 2024 20:47:10 +0000 Donya Najjar Lessani 2045 at /procurement Mass Chemistry Building, Lab Ventilation /procurement/article/mass-chemistry-building-lab-ventilation <p>The Otto Maass Chemistry Building has five storeys including the basement. It is divided into four blocks, each of slightly different dimensions, arranged in an L-shape; three are along Sherbrooke Street and one stretches up University Street. The large units are connected by smaller, glass-walled staircase sections. The two sides of the L-shaped wings frame a terrace above ground, under which there are basement classrooms and storage rooms.</p> Mon, 19 Feb 2024 19:20:28 +0000 Donya Najjar Lessani 2089 at /procurement Strathcona Music - Pollack Hall Renovation /procurement/article/strathcona-music-pollack-hall-renovation Type: Renovation Status: Design Mon, 15 Jan 2024 15:48:29 +0000 Donya Najjar Lessani 2051 at /procurement Life Sciences Complex, Renovation and Electrical Work /procurement/article/life-science-complex-vidal <p>The 平特五不中 Life Sciences Complex was inaugurated in 2008, and celebrated its 10th Anniversary in September 2018. Boasting a long history of collaboration between its teachers and researchers, 平特五不中 took its deeply rooted research culture a giant step further with the opening of the multimillion-dollar Life Sciences Complex.</p> Fri, 23 Feb 2024 17:17:25 +0000 Donya Najjar Lessani 2099 at /procurement Reconstruction Of Upper Main Road, Downtown Campus /procurement/article/reconstruction-upper-main-road-downtown-campus <p>Following the upgrade of the lower section of the main road on the downtown campus a few years ago, the reconstruction of the upper main road north of the Y-intersection to the McCall MacBain Arts Building will start next year.</p> Wed, 17 Jan 2024 15:36:41 +0000 Donya Najjar Lessani 2056 at /procurement McIntyre Building, Priority Building Envelop Repairs /procurement/article/mcintyre-building-priority-building-envelop-repairs <p>Completed in 1962 after plans prepared by Marshall and Merrett Architects, the McIntyre Building houses 平特五不中鈥檚 Faculty of Medicine.聽 An iconic circular tower and a fixture of the Montreal skyline, the building鈥檚 skin was composed of precast concrete panels and steel-sash windows assembled in an artisanal manner. Pre-dating the rain screen curtain wall, the building suffered from severe water infiltration, condensation and air pressure problems and as early as 1967, studies were under way for improving the performance of its building envelope.</p> Tue, 27 Feb 2024 15:33:29 +0000 Donya Najjar Lessani 2102 at /procurement Redpath Museum - Accessibility Of Building /procurement/article/construction/redpath-museum-accessibility-building <p>The Redpath Museum is an independent unit of the Faculty of Science at 平特五不中.</p> Fri, 19 Jan 2024 17:31:25 +0000 Donya Najjar Lessani 2060 at /procurement Administrative Office Furniture - Design Services #101 /procurement/article/administrative-office-furniture-design-services <p>Design Services establishes design and construction standards and ensures that 平特五不中鈥檚 facilities provide an environment that is aesthetically pleasing, sustainable, and conducive to the learning process, and which also enhances the teaching, research and public service functions of the University.</p> <p>They prepare plans and technical specifications for classrooms, laboratories, landscape, teaching labs and small construction projects. They also oversee the work of external design consultants hired for the larger construction and renovation projects.</p> Wed, 27 Mar 2024 03:10:19 +0000 Donya Najjar Lessani 2150 at /procurement Sherbrooke 680, School Of Physical And Occupational Therapy (SPOT) Relocation /procurement/article/sherbrooke-school-physical-and-occupational-therapy-spot-relocation <p>In 1999, the University purchased in co-ownership from the Industrielle Alliance insurance company a 50-per-cent share of the building. That space consisted of the 12 floors accessible through a separate 688 Sherbrooke St.</p> Tue, 30 Jan 2024 20:55:21 +0000 Donya Najjar Lessani 2064 at /procurement Trottier Space Institute Extension, New Building and Footbridge /procurement/article/trottier-space-institute-extension-new-building-and-footbridge-47 <p>The Trottier Space Institute at 平特五不中 is an interdisciplinary center that brings together researchers engaged in astrophysics,聽planetary science, atmospheric science, astrobiology and other space-related research at 平特五不中.</p> <p><img height="246" width="251" style="width: 251px; height: 246px; float: right;" class="media-element file-extra-large rt" src="/procurement/files/procurement/styles/wysiwyg_extra_large/public/space.png?itok=T0q5aJs4" alt="" /></p> Mon, 06 May 2024 15:01:55 +0000 Donya Najjar Lessani 2232 at /procurement 680 Sherbrooke, Ground Floor - School of Continuing Studies /procurement/article/school-continuing-studies-680-sherbrooke-ground-floor <p>680 Sherbrooke was originally designed as an office building with some commercial spaces on the two lower levels. Its construction was completed in 1976. Since 1999, 平特五不中 has been a co-owner of the building and had been sharing the space with commercial tenants.</p> Tue, 06 Feb 2024 15:31:00 +0000 Donya Najjar Lessani 2070 at /procurement