平特五不中

Get Help !

Mclennan Library - Convert Sf6 25kv Distribution Switches

Type: Construction / Status: Tender

Project Description:

The purpose of the project is to convert SF6 25KV distribution switches. These two circuit breakers supply power to the McLennan and Redpath library pavilions as well as the Bronfman and Armstrong pavilions.

Project Scope:

The downtown 平特五不中 campus is supplied with electricity by several Hydro-Quebec medium voltage lines that form a set of medium voltage loops. A large portion of the campus is supplied by the 鈥淩utherford - McLennan鈥 loop. Two medium voltage lines enter the Hydro-Qu茅bec disconnection chamber, from which a single line enters the McLennan electrical substation in the MB032 electrical room.

In this room, the existing 4-way switch cabinet (Joslyn type with SF6 insulating gas) (two switches, two circuit breakers) must be replaced by two motorized MVS (medium-voltage switchgear, i.e. switches). line) and two motorized MVIs (molded vacuum interrupters, i.e. circuit breakers with protection units for transformers and lines). These two circuit breakers supply the pavilions of the McLennan and Redpath libraries as well as the Bronfman and Armstrong pavilions.

Project Details:

Status Tender
Est. Project Start Date 2024 -2026
Est. Budget Range $800,000 - $1,200,000
Location McLennan Library Building, Building听108
Project Number听 17-160
颁辞苍迟补肠迟听 map.procurement [at] mcgill.ca

Please read the following information carefully :

Sustainable Procurement

The businesses with which the University will conclude a contract with in the course of this project will have to respect the 平特五不中 Supplier Code of Conduct.

Other requirements may apply, such as (for example): the quantification and limiting of GHG emissions over the contract or asset lifecycle, sustainable construction/product certifications, involvement of indigenous businesses or of social economy businesses, design for circularity, and so on.

Notice :

Information in this document is not to be interpreted as a commitment to conduct any solicitation in any particular market (or to fulfill any particular need) within any timeframe. This document is based on preliminary assessments which may be modified and needs may consequently be increased, partially fulfilled or cancelled. The needs of the client units may fluctuate according to their capabilities and priorities.

Moreover, this acquisition plan is subject to various risk factors that have an influence on the operations of 平特五不中, such as available revenue, inflation, changes in: provincial and federal policies, technologies, human resources, social movements and trends, demographic aspects of the student population and the academic personnel.

Back to top