平特五不中

Get Help !

Gate House - Interior Renovation

Type: Construction / Status: Design

Project Description:

Complete interior renovation of gatehouse to convert wet labs into workstations and offices and provide universal access washroom.听

Gatehouse 2nd floor
Gatehouse 3rd floor
Gatehouse 4th floor
Gatehouse ground floor

Project Scope:

The Gate House is a four story building connected to the Lyman Duff building by a passageway on the third floor and located on Ave des Pins. It was formerly used for wet labs but has been unoccupied for several years. MNI requested the project to move in bio-informaticians of the Single-Cell Neurobiology Unit. A pre feasibility study was done and the project can provide 36 workspaces.


This project consists in a complete interior renovation to transform the wet labs into dry labs (workstations and offices) and have the building comply to code.

The work include:

  1. New layouts and new finishes
  2. New mechanical, electrical and data systems and connecting the systems to the Lyman Duff building
  3. Partial demolition and new stairs
  4. Second toilette and a kitchenette
  5. Furniture

Rendering images are produced by Aedifica inc.
Rendering images are produced by Aedifica inc.

Project Details:

Status Design
Est. Project Start Date 2024 - 2026
Est. Budget Range $3,000,000 - $4,000,000
Location Duff Medical Building, Building听169
Project Number 22-014
Contact map.procurement [at] mcgill.ca

Please read the following information carefully :

Sustainable Procurement

The businesses with which the University will conclude a contract with in the course of this project will have to respect the 平特五不中 Supplier Code of Conduct.

Other requirements may apply, such as (for example): the quantification and limiting of GHG emissions over the contract or asset lifecycle, sustainable construction/product certifications, involvement of indigenous businesses or of social economy businesses, design for circularity, and so on.

Notice :

Information in this document is not to be interpreted as a commitment to conduct any solicitation in any particular market (or to fulfill any particular need) within any timeframe. This document is based on preliminary assessments which may be modified and needs may consequently be increased, partially fulfilled or cancelled. The needs of the client units may fluctuate according to their capabilities and priorities.

Moreover, this acquisition plan is subject to various risk factors that have an influence on the operations of 平特五不中, such as available revenue, inflation, changes in: provincial and federal policies, technologies, human resources, social movements and trends, demographic aspects of the student population and the academic personnel.

Back to top