Redpath Library Building /library/taxonomy/term/1700/all en Fall 2023 | Books from McLennan-Redpath moving to Collections Centre /library/channels/news/fall-2023-books-mclennan-redpath-moving-collections-centre-350808 <p>Page updated November 14, 2023</p> <p><i>La version française suit.</i></p> Tue, 12 Sep 2023 13:26:10 +0000 merika.ramundo@mcgill.ca 11058 at /library Facilities Projects Update | McLennan-Redpath Library Complex /library/about/update-mclennan-redpath-library-complex-infrastructure-projects <p>The McLennan-Redpath Library Complex is the focal point for two major parallel infrastructure projects — the new McGIll University Collections Centre and the Fiat Lux Project. The collections move and subsequent renovation work will nearly double space in the complex for students and create a vibrant library environment space that is accessible, comfortable, safe, and sustainable.</p> <p>Visit this space often for the most up-to-date information on both initiatives.</p> Thu, 14 Sep 2023 15:47:55 +0000 merika.ramundo@mcgill.ca 11059 at /library Excavation work on select areas of lower west field begins June 19 /library/channels/news/excavation-work-select-areas-lower-west-field-begins-june-19-348735 <p><i>La version française suit.</i></p> <p>In anticipation of the transformation of the McLennan-Redpath Library Complex, some excavation work will be conducted on select areas of the lower west field adjacent to the McLennan and Redpath Library buildings. The McLennan-Redpath Library buildings are part of a designated heritage site. Standard protocol requires that ƽÌØÎå²»ÖÐ conduct an archeological excavation before starting any large-scale construction project.</p> Fri, 16 Jun 2023 12:52:17 +0000 merika.ramundo@mcgill.ca 11007 at /library Accessing McLennan-Redpath materials during the Collections Centre move-in period /library/channels/news/accessing-mclennan-redpath-materials-during-collections-centre-move-period-342199 <p>Two major parallel infrastructure projects—a new Collections Centre and Fiat Lux will transform the quality of services and spaces the Library offers. Library staff members are preparing for the movement of collections, spaces, and services in advance of renovation and construction activities. Part of this process includes planning the movement of materials to the Collections Centre, which is currently under construction and scheduled to begin ingesting books in mid-2023 and be fully operational in early 2024.</p> Wed, 21 Sep 2022 19:37:30 +0000 merika.ramundo@mcgill.ca 10864 at /library April 29 from 5:30-7:30AM | Electrical shutdown in the McLennan-Redpath Library Complex /library/channels/news/april-29-530-730am-electrical-shutdown-mclennan-redpath-library-complex-339217 <p>Please note that a planned, sector-wide power outage will affect the McLennan-Redpath Library Complex on <strong>Friday, April 29 from 5:30am to 7:30am</strong>.</p> <p>The sole source of lighting during this period will be emergency lighting in hallways and exit areas.</p> <p><u>For safety reasons, ƽÌØÎå²»ÖÐ security guards will escort Library users out of the McLennan-Redpath Complex before the shutdown is set to begin.</u></p> <p>We regret any inconveniences this situation may cause.</p> <p>Questions? <a href="/library/contact/askus">Ask us</a>.</p> Tue, 26 Apr 2022 01:45:15 +0000 merika.ramundo@mcgill.ca 10760 at /library Heaters added to outdoor tent on McLennan-Redpath terrace starting December 1 /library/channels/news/heaters-added-outdoor-tent-mclennan-redpath-terrace-starting-december-1-335193 <p>As of Wednesday, December 1, the ƽÌØÎå²»ÖÐ community can take advantage of a new, heated, outdoor area. </p> <p>Heaters in the tent located on the McLennan-Redpath terrace will provide ƽÌØÎå²»ÖÐ students, staff and faculty with a safe, warm, space to take a break, dine, study, and socialize.</p> <p>Heaters will be operational Monday to Friday, from 8:00 AM to 6:00 PM (excluding <a href="/importantdates/key-dates">holidays</a>).</p> Fri, 26 Nov 2021 20:29:57 +0000 merika.ramundo@mcgill.ca 10647 at /library Appointment notice - Executive Director of the Fiat Lux Library Building Project / Avis de nomination - directeur général du projet de la Bibliothèque Fiat Lux /library/channels/news/appointment-notice-executive-director-fiat-lux-library-building-project-avis-de-nomination-directeur-299524 <p>Message sent on behalf of Yves Beauchamp, Vice-Principal, Administration and Finance / Ce message est envoyé au nom de Yves Beauchamp, vice-principal, administration et finances</p> <p>___</p> <p>Dear colleagues,</p> <p>It is my great pleasure to announce the appointment of <strong>Mr. Robert Hamilton</strong>, B. Arch., B. Sc. Arch., as Executive Director of the Fiat Lux Library Project. Mr. Hamilton begins his new role on September 3, 2019.</p> Tue, 13 Aug 2019 21:48:06 +0000 merika.ramundo@mcgill.ca 9994 at /library July 20 Terrace along Redpath Library Building inaccessible /library/channels/news/july-20-terrace-along-redpath-library-building-inaccessible-288089 <p>Please note that on <span>Friday, </span><span>July 20 from 7am to 3pm, the terrace facing lower field along the Redpath Library Building will be inaccessible due to tree removal. </span></p> <p><span>The terrace will be closed from the north end (Redpath Museum) to the terrace garden. </span></p> <p><span>Access to lower campus and the McLennan Library Building continues to be accessible from McTavish Street. Two security agents will be on site to redirect pedestrian traffic on McTavish street. </span></p> <p>We apologize for the inconvenience.</p> <p> </p> <p> </p> Wed, 18 Jul 2018 19:49:15 +0000 merika.ramundo@mcgill.ca 9459 at /library